Skip to content
Central Group
  • Contact Us
  • Company Brochure
01432 354 000
info@centralroofing.co.uk
Enquire
  • About Us
    Contact Us Find Out More

    About Us

    • Our Story
    • Our Leadership
    • Central Group News
  • Roofing & Cladding
    commercial metal roofing at a laboratory in South Wales
    Roofing & Cladding Find out more

    Roofing & Cladding

    • Commercial Flat Roofing
    • Pitched Roof Installation
    • Metal Roofing Services
    • Roof Access & Protection Systems
    • Exterior Cladding Services
    • Rooflight Renewal
    • Environmental Roof Installation
    • Flat To Pitched Roof Conversions
  • Other Services
    drone roof surveys carried out by Central Group
    Other Services Find out more

    Other Services

    • Building Works
    • Roof Surveys & Inspections
    • Principal Contractor
    • Gutters & Rainwater Goods
    • Commercial Roof Maintenance & Small Works
  • Our Work
    Our Work Find out more

    Our Work

    • Education
    • Healthcare
    • Housing
    • Commercial
    • Industrial
  • Quality & Safety
    commercial roofing contractors felt installation
    Quality & Safety Find out more

    Quality & Safety

    • Health and Safety Innovation
    • Accreditations & Policies
    • Waste
  • Our Offices
    Our Offices Find out more

    Our Offices

    • Hereford Office
    • Birmingham Office
    • Bridgend (CRSW)
    • Carmarthen and Newport Offices
    • Bristol Office
    • Manchester Office
    • South East London Office
    • Edinburgh Office
  • Delivering Responsibly
    solar panel cleaning robot
    Sustainability Find out more

    Delivering Responsibly

    • Community Support
    • Environmental Responsibility
    • Equality & Diversity
    • Skills & Operations
    • Local Sourcing
  • Careers
    Vacancies Find out more

    Careers

    • Life at Central
    • Health & Wellbeing
    • Vacancies
    • Apply Now
Central Group
  • About Us
    Contact Us Find Out More

    About Us

    • Our Story
    • Our Leadership
    • Central Group News
  • Roofing & Cladding
    commercial metal roofing at a laboratory in South Wales
    Roofing & Cladding Find out more

    Roofing & Cladding

    • Commercial Flat Roofing
    • Pitched Roof Installation
    • Metal Roofing Services
    • Roof Access & Protection Systems
    • Exterior Cladding Services
    • Rooflight Renewal
    • Environmental Roof Installation
    • Flat To Pitched Roof Conversions
  • Other Services
    drone roof surveys carried out by Central Group
    Other Services Find out more

    Other Services

    • Building Works
    • Roof Surveys & Inspections
    • Principal Contractor
    • Gutters & Rainwater Goods
    • Commercial Roof Maintenance & Small Works
  • Our Work
    Our Work Find out more

    Our Work

    • Education
    • Healthcare
    • Housing
    • Commercial
    • Industrial
  • Quality & Safety
    commercial roofing contractors felt installation
    Quality & Safety Find out more

    Quality & Safety

    • Health and Safety Innovation
    • Accreditations & Policies
    • Waste
  • Our Offices
    Our Offices Find out more

    Our Offices

    • Hereford Office
    • Birmingham Office
    • Bridgend (CRSW)
    • Carmarthen and Newport Offices
    • Bristol Office
    • Manchester Office
    • South East London Office
    • Edinburgh Office
  • Delivering Responsibly
    solar panel cleaning robot
    Sustainability Find out more

    Delivering Responsibly

    • Community Support
    • Environmental Responsibility
    • Equality & Diversity
    • Skills & Operations
    • Local Sourcing
  • Careers
    Vacancies Find out more

    Careers

    • Life at Central
    • Health & Wellbeing
    • Vacancies
    • Apply Now
  • Contact Us
  • Company Brochure
01432 354 000
info@centralroofing.co.uk
Enquire
Building Services, Roofing

What Is a Principal Contractor?

Under the Construction (Design and Management) Regulations 2015 (CDM 2015), a Principal Contractor is appointed in writing by the client when a construction project involves more than one contractor. Their role is to plan, manage, monitor and coordinate health and safety throughout the construction phase.

This guide explains the Principal Contractor’s key responsibilities, when an appointment is required and what the role involves in commercial construction projects.

What Does a Principal Contractor Do?

CDM 2015 sets out specific duties covering site arrangements, contractor oversight and communication between project dutyholders. These include:

Plan, Manage, Monitor and Coordinate the Construction Phase

This involves planning the sequence of construction activities, managing risks where contractors’ work overlaps and coordinating appropriate safety measures across the site. The Principal Contractor must monitor site conditions, review safety arrangements as work progresses and take action where necessary to protect workers, visitors and members of the public.

Prepare and Maintain the Construction Phase Plan

The Principal Contractor must ensure a written construction phase plan is prepared before work begins. This document sets out how health and safety risks will be managed, including site access arrangements, responsibilities for implementing safety measures and controls for high-risk activities. It must be regularly reviewed and revised to remain suitable as site conditions, activities and project requirements change.

Coordinate Contractors, Site Inductions and Welfare

The Principal Contractor must check that those they appoint have the necessary skills, knowledge, experience and, where relevant, organisational capability to carry out their work safely. They must also ensure workers receive site-specific inductions and necessary safety information, consult workers, provide and maintain suitable welfare facilities and take steps to prevent unauthorised site access.

Liaise With the Client and Principal Designer

Ongoing liaison with the client and Principal Designer ensures relevant project information is shared, design changes are communicated and any resulting health and safety risks are addressed.

When Is a Principal Contractor Required?

Under CDM 2015, commercial clients must appoint a Principal Contractor in writing when a construction project involves, or is reasonably expected to involve, more than one contractor. This includes subcontractors, even if they work on site at different stages of the project.

The appointment must be made as soon as practicable and before the construction phase begins. While these requirements apply to commercial clients, CDM 2015 sets out different arrangements for domestic clients, whose duties generally transfer to other project dutyholders.

What Skills and Experience Should a Principal Contractor Have?

Under Regulation 8 of CDM 2015, anyone appointed as a Principal Contractor must have the skills, knowledge and experience necessary to fulfil their duties. Where the appointment involves an organisation, it must also have the appropriate organisational capability. These requirements cover:

– Skills: The practical ability to plan, manage, monitor and coordinate construction work while controlling health and safety risks.
– Knowledge: An understanding of relevant construction legislation, statutory duties and the safety measures required for the project.
– Experience: Sufficient experience of comparable construction activities and the risks associated with managing multiple contractors.
– Organisational capability: Appropriate management arrangements, personnel, resources and procedures to carry out the Principal Contractor’s duties effectively.

The required level of competence and organisational capability must be proportionate to the nature, scale and complexity of the project, including its foreseeable health and safety risks.

Principal Contractor vs Principal Designer: What Is the Difference?

Under CDM 2015, the Principal Designer manages health and safety during the pre-construction phase and continues to coordinate any design work that carries on during construction, identifying and coordinating measures to address risks arising from the design. The Principal Contractor manages health and safety during the construction phase, coordinating contractors, overseeing site activities and managing risks associated with carrying out the work.

Both dutyholders must work together and share relevant information throughout the project. This ensures that risks identified during the design stage are communicated to those carrying out the construction work, and any design changes are properly coordinated.

Principal Contractor vs Main Contractor: Are They the Same?

Although the same company may fulfil both roles, a Principal Contractor and a main contractor are not necessarily the same. A Principal Contractor has specific legal duties under CDM 2015 for managing health and safety during construction. In contrast, a main contractor or head contractor typically oversees the delivery of construction work under their contract.

The distinction is important because being appointed as the main contractor does not automatically establish the Principal Contractor role. On commercial projects involving multiple contractors, the client must make a written Principal Contractor appointment before the construction phase begins.

Why Is the Principal Contractor Role Important on Roofing and Refurbishment Projects?

Commercial roofing and refurbishment projects often involve several specialist contractors working across different stages of construction. Effective coordination is essential, particularly where activities involve scaffolding, roof access, working at height and the movement of materials around site. The Principal Contractor is responsible for managing these activities and ensuring appropriate health and safety arrangements are maintained throughout the construction phase.

This becomes particularly important on occupied buildings and operational sites, where construction work must be carefully managed alongside existing activities. Central Group’s experience on occupied sites includes planning roofing works around building operations and coordinating specialist contractors where access is restricted. 

Find out more about Central Group’s Principal Contractor services and its approach to managing commercial construction projects.

Principal Contractor Example: Capita Park, Rotherham

Central Group acted as Principal Contractor for an 11,000 m² roof refurbishment at Capita Park in Rotherham. The project involved replacing an ageing single-ply roofing system while the building remained operational as a major call centre. Central managed strict health and safety requirements, coordinated site activities and provided in-house supervision throughout the five-month programme, carefully planning works around the building’s ongoing operations.

Read more about the Capita Park Principal Contractor project to see how Central Group managed the refurbishment.

What Should a Client Look for When Appointing a Principal Contractor?

Choosing an experienced Principal Contractor is particularly important for commercial roofing and refurbishment projects, where multiple trades, restricted access and ongoing building operations can create additional challenges. Clients should look for a contractor who can demonstrate:

– Experience with comparable projects: A proven track record of delivering commercial roofing and refurbishment works involving complex site requirements.
– Effective project coordination: The ability to organise specialist trades, manage work schedules and maintain clear communication between contractors.
– Health and safety management: Established procedures for construction phase planning, risk management and ongoing site supervision.
– Experience working on live sites: An understanding of how to coordinate construction activities around occupied buildings, operational requirements and restricted access.
– Appropriate resources and supervision: The personnel, management arrangements and technical expertise needed to oversee the project effectively.

Principal Contractor Services at Central Group

Central Group brings over 40 years of commercial roofing experience to Principal Contractor appointments, including refurbishment projects on occupied and operational sites. Our roofing services include flat roofing, metal roofing and pitched roofing.

Contact our team to discuss your project requirements and find out how Central Group can support your next project.

Principal Contractor FAQs

Does every construction project need a Principal Contractor?

No. Under CDM 2015, a Principal Contractor is required when a project involves, or is reasonably expected to involve, more than one contractor. Projects involving only one contractor do not require a Principal Contractor appointment, although other CDM duties still apply.

Who appoints the Principal Contractor?

The commercial client is responsible for appointing the Principal Contractor in writing. The appointment should be made as early as possible and before the construction phase begins.

Does a Principal Contractor need to be on site at all times?

A Principal Contractor is not legally required to be physically present on site at all times. However, they must maintain effective arrangements for managing, monitoring and supervising construction activities throughout the project.

Can a Principal Contractor appoint subcontractors?

Yes. A Principal Contractor can appoint subcontractors to carry out specialist construction activities, provided they have the necessary skills, knowledge, experience and organisational capability. The Principal Contractor remains responsible for coordinating health and safety across the construction phase.

Previous Article
Types of Commercial Roofing Systems Explained

Latest Articles

Building Services, Roofing

What Is a Principal Contractor?

Find out more
Roofing

Types of Commercial Roofing Systems Explained

Find out more
Central Group

Useful Links

  • About Us
  • Our Roofing & Cladding Services
  • Other Services
  • Our Work
  • Quality & Safety
  • Locations
  • Central Group News
  • Contact Us

Connect With Us

  • @centralgroup
  • @centralgroup
  • @centralgrouproofing
  • @centralgrouproofing
  • 01432 354 000
  • info@centralroofing.co.uk
Central Group refers to the company names Central Roofing and Building Services Limited (CRBS) and Central Roofing South Wales Limited (CRSW)
ConstructionLine
CHAS logo
Achilles verified logo
NFRC logo
Build UK logo
Community Champion stamp logo
Armed Forces Covenant logo

Central Roofing and Building Services Limited (CRBS) and Central Roofing South Wales Limited (CRSW)© 2026

  • Terms and Conditions
  • Cookie Policy
  • Quality Policy